GS · Corsica / Sardinia 2026Roadbook français PDF ↗

18 September — 3 October 2026 · 3 BMW R1250 GSAs

Mediterranean
moto roadbook.

One daily command center now combines the roadbook, staged Google Maps routing, exact must-stop POIs, conditional route decisions and offline GPX backups. Google Maps executes the road; the GPX preserves the master plan.

16days
3riders
5ferries
4,000+ride km
Shared trip administrationSpliit expense tracker

Enter shared fuel, tolls, hotels, ferries, meals and other group costs before or during the trip.

Open expense tracker ↗Direct group link · opens immediately in a new tab.

Daily command center · V3.3 · detailed schedules

Everything for the day.
One place.

Select a date for the complete operating plan: KSU, hour-by-hour timeline, cutoffs, route stages, live map, Google Maps links, must-stop POIs and offline GPX backup.

1 · OPEN THE DAY

Review the KSU, detailed timeline and GREEN / AMBER / RED conditions before the bikes move.

2 · RIDE IN STAGES

Use the staged Google Maps buttons so Google cannot silently shortcut the key roads.

3 · KEEP GPX OFFLINE

Use OsmAnd only as the fixed-track backup when coverage/routing fails.

High Alpine & Ridge Safety

Mountain Pass Weather & Decision Monitor

Live data via Open-Meteo · Auto GREEN / AMBER / RED
STATUS: GREEN · PASSES CLEAR Wind gusts < 40 km/h and dry road conditions. High alpine routes and twisty mountain passes are fully rideable.
Temperature--°C
Wind Speed-- km/h
Peak Ridge Gusts-- km/h
Precipitation-- mm
NAVIGATION + TRAFFIC AUDIT · 1 SEP 2026
Ports now use operator/port access points; beaches route to parking; motorway transit no longer uses pass-through city centres; mountain POIs are pinned on-road. Overnight city endpoints are intentionally provisional until hotels are booked.

Booking board · all five ferries confirmed

Transport backbone.

Every booking is grouped here with its reservation and ticket references, passengers, cabin, motorcycles, price and boarding instructions. All five crossings are now booked.

Upcoming

Toulon → Bastia

Corsica Ferries · Booking #264232014.0 (BOUANANI)

Countdown to Vehicle Boarding Gate Closure
00Days
:
00Hours
:
00Mins
:
00Secs
Boarding Gate Closes20 Sep 2026, 18:00
Scheduled Sailing20 Sep 2026, 19:00
Vehicle Access GateToulon Ferry Terminal
PUBLIC-SITE SAFETY: passport/document numbers, email addresses, phone numbers and account identifiers are intentionally excluded. Operational booking references and motorcycle registrations are retained.

Locked French finale

Epic when green.
Easy to cut.

Route Napoléon and Verdon are the core. Gorges de la Nesque is planned for 1 October, with a skip option if late. Ventoux is the first cut; protect the 16:00 Sète arrival target.

30 SEP · GREEN

Full Verdon

Genoa bikes rolling by ~09:30 → Route Napoléon → Castellane → Point Sublime → full clockwise D23 → Manosque.

30 SEP · AMBER

Core Verdon

09:30–10:15 → keep Route Napoléon + best Verdon viewpoints; shorten the D23 loop.

01 OCT · GREEN

Nesque + Ventoux

Leave Manosque by ~06:15 → Sault → Gorges de la Nesque → Bédoin → Ventoux → Malaucène → fast transfer to Sète.

01 OCT · AMBER

Nesque only

Ventoux windy/foggy/wet but canyon safe → ride Nesque, skip summit, protect Sète.

01 OCT · RED

Direct Sète

At Sault, if live routing including stops no longer preserves Sète by 15:00, skip Nesque too. Heavy rain or poor group condition → direct Sète; 16:00 arrival target wins.

Next actions

What still needs
to be locked.

Tick items locally as they’re completed. The state is saved in this browser.

Captured moments · Corsica & Sardinia 2026

Memories

Our roads, our stops, our stories. Share your photos and videos in the trip album.

Latest additionsLoading photos…

The latest 10 additions appear here. Tap a photo to enlarge it and use the arrows to browse.

View the full album ↗

Trip memories
Trip photo
Open full album ↗